IMG_8485.jpg
The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer00000
(0 votes)
IMG_8518.jpg
Existing section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozer00000
(0 votes)
IMG_8517.jpg
The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer00000
(0 votes)
IMG_8515.jpg
On 40 meter section prior to completion. dozer00000
(0 votes)
IMG_8514.jpg
One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer00000
(0 votes)
IMG_8513.jpg
Sprinkling water on the wall surface during the rendering process. dozer00000
(0 votes)
IMG_8505.jpg
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer00000
(0 votes)
IMG_8502.jpg
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer00000
(0 votes)
IMG_8484.jpg
Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer00000
(0 votes)
IMG_8483.jpg
Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer00000
(0 votes)
DSC02458.JPG
The footing for the bathroom. The ground beam will be on top of this.dozer00000
(0 votes)
DSC02451.JPG
The external bathroom footing with the rebar footing pad in place. dozer00000
(0 votes)