Top rated - House Construction |

The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer     (0 votes)
|
|

Existing section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozer     (0 votes)
|
|

The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer     (0 votes)
|
|

On 40 meter section prior to completion. dozer     (0 votes)
|
|

One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer     (0 votes)
|
|

Sprinkling water on the wall surface during the rendering process. dozer     (0 votes)
|
|

Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer     (0 votes)
|
|

Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer     (0 votes)
|
|

Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer     (0 votes)
|
|

Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer     (0 votes)
|
|

The footing for the bathroom. The ground beam will be on top of this.dozer     (0 votes)
|
|

The external bathroom footing with the rebar footing pad in place. dozer     (0 votes)
|
|