happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
DSCN0476.jpg
Columns and Utility UnitsThe second utility/storage unit has a split roll up door. Each unit is about 4m wide x 6 m long. There are overall 30 columns throughout the project.dozer00000
(0 votes)
DSCN0475.jpg
Drive Way and Roll Up DoorThe parking lot along with a 2m side covered area. There are two storage/utility rooms with roll up doors. The ceiling is done using Chang brand 'smart board' which is vented to allow air flow in the attic.dozer00000
(0 votes)
IMG_3656.jpg
Putting up the CurtainsThe curtain and curtain rails were bought from a curtain shop at jatujak market, price was reasonable and nice r looking that most. dozer00000
(0 votes)
IMG_3655.jpg
Curtain RailInstalling the Curtain Raildozer00000
(0 votes)
IMG_3535.jpg
Under Cabinet Stainless RailsInstalling under cabinet stainless rails used to hang things (pots, pans, etc). dozer00000
(0 votes)
IMG_2814.jpg
CabinetsKitchzo kitchen cabinets as installed. dozer00000
(0 votes)
IMG_2619.jpg
More Paint ApplicationRolling paint on the eves overhanging the gable. dozer00000
(0 votes)
IMG_2617.jpg
Painting External CeilingPainting the external ceiling with a water based paint, timbershield. dozer00000
(0 votes)
IMG_2611.jpg
Applying Wall Putty to Ext CeilingMore putty put in the cracks between the ceiling panels. dozer00000
(0 votes)
IMG_2604.jpg
Applying Wall Putty to Ext CeilingUsing putty to cover the junction between the smart boards.dozer00000
(0 votes)
IMG_2442.jpg
Painters Start PrimerThe painters start applying primer to the ceiling. dozer00000
(0 votes)
IMG_2311.jpg
Completed ColumnA view of a completed column. dozer00000
(0 votes)
943 files on 79 page(s) 45

Debug Info 
Debug Output: show / hide