happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_3074.JPG
Footing holeThe footing hole and base framework on a poured concrete lip.
dozer00000
(0 votes)
IMG_3076.JPG
Footing holeThe footing hole with rebar framework.
dozer00000
(0 votes)
IMG_3083.JPG
Form work for ground beamThe wood form work to support the pour of the ground beam which sits on the footing. The ground beam will be 10 centimeters wide by about 20 centimeters deep.
dozer00000
(0 votes)
IMG_3086.JPG
Ground BeamPour in progress.
dozer00000
(0 votes)
IMG_3087.JPG
Ground BeamAfter a completed pour with the metal frames distributed evenly at 2.5 meter intervals.
dozer00000
(0 votes)
IMG_3094.JPG
Staggered Ground BeamA staggered ground beam design to accommodate for unevenness in the ground level.
dozer00000
(0 votes)
CTHP2FinishedView.youtube
Video WalkthroughA quick video walk though of the project a while after completion. dozer00000
(0 votes)
DSCN0415.jpg
Side Walkway and GardenThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozer00000
(0 votes)
IMG_0164.jpg
StudySmall sandstone tiles are used on the wall area of the study.dozer00000
(0 votes)
DSCN0493.jpg
Storage Unit InsideAnother view of the storage/utility room with metal racks currently used for storage. dozer00000
(0 votes)
DSCN0492.jpg
Ladder and AccessThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozer00000
(0 votes)
DSCN0491.jpg
Secured StorageThe security partition to make a secured storage area. The partition is made of 1 by 1 lengths of metal welded into a mesh pattern.dozer00000
(0 votes)
943 files on 79 page(s) 43

Debug Info 
Debug Output: show / hide