happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_3913.JPG
Front of HouseThe front of the house. Note the window openings each have a vertical rebar column on each side. A 10 cm beam will be poured across the top of the window and door openings at a 2.1 m distance from the floor.
dozer33333
(1 votes)
Concrete_Compressive_Strength.JPG
Concrete Compressive Strength VerificationThis report shows the results of the compressive strength test on the concrete samples taken by the quality control staff. It is a good verification as the quality of the concrete used in the foundation is significant.dozer22222
(2 votes)
080230827BathRPanLi85_.jpg
Bathroom View 3dozer22222
(2 votes)
DSC03189.JPG
Fascia BoardThe fascia board being applied. It fits nicely in a groove under this CPAC monier roof tiles. The bird guard is applied while this fascia board is being applied. dozer22222
(1 votes)
IMG_3444.JPG
Example Roof TrussA roof truss from a different project. We will be using a modification of this with a 'm' truss design. The shot is notable, because normally a 'truss' system is not used here. With foundation columns and internal walls, the roof structure is normally dependent on being able to be supported within the house boundaries, ie not a truss.
dozer22222
(1 votes)
IMG_4043.JPG
Comparison Regular Cinderblock to Oversize CinderblockThis shows the size differential between the normal cinderblock and the oversize cinderblock. Please also note that the normal cinderblock generally has no openings at the bottom, where the oversize has standard size openings in the top and bottom.dozer22222
(1 votes)
DSC03069~0.JPG
Color Render ApplicationThere are two layers of render coat applied before the color coat. The render is applied rough and let set up until a finish coat is applied. dozer22222
(1 votes)
IMG_3131.JPG
Pouring a ColumnThe columns are poured after the blocks are laid in place. Here a piece of metal is being used to vibrate the concrete into place within the formwork.dozer22222
(1 votes)
IMG_4196.JPG
Interior Wall use of Plumb BobA plumb bob is used to set a vertical line for the interior walls that will be brought 'true' during the render application. Straight lines are use vertically and horizontally.dozer22222
(3 votes)
IMG_4540.jpg
Air VentAir from the plumbing appliances, such as toilet, sink, floor drains, urinal are properly vented up through the wall and out of the ceiling. This is rather rare in Thai construction but is a standard in other countries. The symptom of improperly vented appliances is that they do not flow properly, the vents allow air into the system so no vacuum is formed, allowing a proper flow.dozer11111
(2 votes)
IMG_3777.JPG
This shows the relative size of the large cinderblocks along with the crushed stone aggregate that will be used in concrete within every other hole of the blocks. The walls thus created will be load bearing walls, every other hole will be filled with 12mm metal rebar and concrete to make the embedded support columns.
dozer11111
(2 votes)
IMG_3361.JPG
Frame SpacerThe use of a spacer with metal tie to keep the metal frame off the surface. The spacer is used to keep the rebar metal frame in the middle of the anticipated concrete pour.
dozer11111
(2 votes)
943 files on 79 page(s) 3

Debug Info 
Debug Output: show / hide