Top rated - House Construction |

Galvanized Sheeting for Roof ValleyMost of the problems with CPAC concrete roof tiles come from inadequate valley material or poorly done ridges. It is easy to get the wrong stuff, just go to any supply store and ask for the valley material that everyone uses. This is the 1 meter wide material, formed in the center for water run-off, roofs with this as valley material (properly installed) don't have problems. dozer     (0 votes)
|
|

CPAC Monier Roof TilesThe CPAC Monier roof tiles being laid in place. These tiles are basically dummy proof, except at the valley and ridges. dozer     (0 votes)
|
|

Properly Installed Bird StopThis bird stop has about the right clearance, a snug fit is required or otherwise you will get unwanted entry points. dozer     (0 votes)
|
|

Ridges Laid in PlaceThe ridge tiles are laid in place over a waterproofed (via Sika) concrete mix. Note that the exposed concrete will still need to be treated with a exterior coat of waterproofing agent. The other method is dry tech, which is not used here. dozer     (0 votes)
|
|

CPAC Compressive Strength CertificationA portion of the certification that the samples were tested and the corresponding results. The status field indicates 'p'ass or 'f'ail and the stress column indicates the amount of stress the samples withstood. In this case the 280 ksc samples withstood a minimum of 340 ksc prior to failure. dozer     (0 votes)
|
|

Poured FootingThe poured footing. The footings are poured and then the ground beam is tied into place around the footing structure. dozer     (0 votes)
|
|

External RenderThe aerated blocks again use a specific product for the external render. It is a ready mix cement skim coat type product. It is easy to work and makes for a smooth and nice render finish. The final thickness of the walls will be 12.5 centimeters so this is being applied about 2.5 centimeters on each side. dozer     (0 votes)
|
|

Spacers in Preparation for Column PourSpacers are applied to the outside of the column frame so that the frame will remain centered within the form wood during the pour. dozer     (0 votes)
|
|

Window Opening being SquaredHere the opening is in the process of being squared. dozer     (0 votes)
|
|

Lintel Pour above the Bathroom DoorHere the lintel is being poured about the bathroom door, and will be continued to the right to form a horizontal ring beam. dozer     (0 votes)
|
|

ArchwayOnly the bottom portion of the archway is actually poured. The top of the archway (as seen to the left) will be continued using red bricks and mortar. dozer     (0 votes)
|
|

WindowA window showing a horizontal ring beam underneath it, lintel/beam on top and vertical beams to either side. The picture is at an odd angle, the window is perfectly true (but doesn't look like it in the pic). dozer     (0 votes)
|
|