happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
0802221236BathRShSidei95_.jpg
Bathroom View 2Notice the two level ceiling which adds a bit of depth to the roomdozer55555
(2 votes)
IMG_3971~0.JPG
Location of Electrical Breaker PanelThis is the front right side of the house as you go in through the front door. Note the cluster of yellow PVC electrical conduit to the right of the glass blocks. This is where the electric breaker panel will be located.dozer44444
(1 votes)
IMG_3810.JPG
Power Point BoxThe power point box secured in place with cement.
dozer44444
(1 votes)
DSC03181.JPG
Interior WallThe start of the interior wall laying process. dozer44444
(1 votes)
IMG_3939.JPG
Oversize Cinderblock Laying ProceedsThe block laying proceeds on top of the second horizontal beam. Note the vertical vent PVC pipes extend upward through designated holes in the blocks.
dozer44444
(1 votes)
IMG_1995.jpg
Wood in RaftersHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer44444
(1 votes)
IMG_3972.JPG
Rebar Frame Work for Beam #3This is the rebar framework which will go in the top horizontal beam, located at a distance of 3 m. - 3.2 m from the floor level.
dozer33333
(2 votes)
IMG_4725.jpg
Electric Power PointMost electric face plates only have one row of receptacles. These Panasonic face plates give two rows. The house has a abundant supply of outlets. dozer33333
(1 votes)
IMG_4507.jpg
Water TankNote the rebar that surrounds the tank and extends out of the walls. This was a part of the rebar meshing used to re enforce the structure. The interior cinderblock is formwork but will remain in the finished structure. It will be rendered with a waterproofing agent as was the cement in the walls of the tank. dozer33333
(1 votes)
IMG_4117.JPG
Depth IndicatorA depth of render indicator is plastered in place prior to render application. This is used to determine the thickness of the render to be applied. dozer33333
(1 votes)
DSC03131.JPG
Glass BlocksThis shot shows glass blocks being installed and the use of plastic spacers at the intersections to keep the blocks equidistant (spacing of 1 cm). dozer33333
(1 votes)
IMG_3959.JPG
A lintel will be poured on top of each section of decorative glass blocks as if they were a window. No load bearing capabilities for the glass blocks are assumed.
dozer33333
(1 votes)
943 files on 79 page(s) 2

Debug Info 
Debug Output: show / hide