|

Top rated - House Construction |

Service Opening Water TankThe finished and plumbed water tank with the automatic pump on top. dozer     (0 votes)
|
|

Tank ServiceThe inside of the tank being cleaned of any debris.dozer     (0 votes)
|
|

Proper Leveling of ToiletThe toilet being check for level during installation.dozer     (0 votes)
|
|

Septics after PourThe service openings are placed to be level with the walkway. dozer     (0 votes)
|
|

Rebar Framing for Water TankThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozer     (0 votes)
|
|

Framework for Water TankAnother view of the frame work lattice which sits on top of 6 small footings. The framework is centered to be within the external wall using red bricks a spacers.dozer     (0 votes)
|
|

Sika Water ProoferSika 'gan sum' waterproofing agent is added to the concrete mix.dozer     (0 votes)
|
|

Framed and Poured External WallsAfter the floor pour is completed, the framework as seen is installed and the external walls are poured to a thickness of 15 centimeters. dozer     (0 votes)
|
|

Simple SepticAnother view of a simple septic system with the waste pipe entering the concrete rings a a sufficient angle to allow flow. All of the septics are vented with the exhaust about the perimeter wall. dozer     (0 votes)
|
|

Poured Underground Water TankThe poured underground water tank. The wall thickness is 15 centimeters. The dimensions are about 2.5 meters x .70 meter width by 1 meter depth. dozer     (0 votes)
|
|

Undermount Stainless Kitchen SinkThe under mount stainless kitchen sink will sit under the custom cut granite counter top.dozer     (0 votes)
|
|

Additonal Waterproofing Agent Applied to the BottomLanko K11 waterproofing agent is skim coated on the bottom (as shown) and will be applied to the sides of the enclosure as well. dozer     (0 votes)
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |
17 |  |
 |
 |
 |
|

|
|
|