happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_9002.jpg
Junction boxJunction box positioned in the wall.dozer00000
(0 votes)
IMG_9003.jpg
Electric Line in WallAfter the electric conduit is run up through the wall it is cemented over for a seamless finish render coat.dozer00000
(0 votes)
IMG_9028.jpg
Front Junction box areaThis shows the inside + outside junction boxes at the front of the house.dozer00000
(0 votes)
IMG_9049.jpg
Junction BoxClose up of junction box showing conduit (which is routed in the wall) securely affixed. dozer00000
(0 votes)
IMG_9051.jpg
Control UnitThe control unit for the breakers will be installed here. There are 6 zones attached to individual breakers. The breaker size depends on the load for that zone. Electrics are bticino matix. dozer00000
(0 votes)
IMG_9052.jpg
Upper Switch box + Lower Receptacle boxThe switch boxes + power points are secured fastened within the wall at the designated points. dozer00000
(0 votes)
IMG_9097.jpg
Junction BoxThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozer00000
(0 votes)
IMG_9369.jpg
PVC Pipe Joined to Tested SectionThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozer00000
(0 votes)
IMG_9409.jpg
Finished Submerged Water TankThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozer00000
(0 votes)
IMG_9597.jpg
Lanko K11 WaterproofingThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozer00000
(0 votes)
IMG_9629.jpg
Sloped Bathroom FloorsThe bathroom floors are sloped to allow water run off towards the drain pipe (shown on the left of the solids drain pipe). dozer00000
(0 votes)
IMG_9681.jpg
Water HeaterThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozer00000
(0 votes)
943 files on 79 page(s) 16

Debug Info 
Debug Output: show / hide