happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Top rated - House Construction
IMG_9284.jpg
Front Brick ColumnsThe front brick columns sit on either side of the drive way. The columns contain the electric conduit which is run up to the top to support the exterior wall lighting. The inside of the columns is filled with concrete.dozer00000
(0 votes)
IMG_9283.jpg
Driveway PourIn preparation for the driveway pour the surface is leveled for the correct sloping angle and then the frame mesh is put in place at intervals of 20 centimeters. The red bricks are used as spacers. The pour will be 10 centimeters in depth. dozer00000
(0 votes)
IMG_9290.jpg
Driveway Pour in ProcessHand mix was used on the driveway. Red bricks are used as a starting spacer to ensure that the rebar mesh doesn't sit on the ground, further adjustment is done by the 'pull into place method' as the pour progresses. The meshing is pulled to be centered within the 10 centimeter pour.dozer00000
(0 votes)
IMG_9707.jpg
Water Flow TestThe walkway is designed to slope out. Then the external gutter area will route water down to the street. dozer00000
(0 votes)
IMG_9720.jpg
Water Flow Test and Drainage PVCThe drainage PVC has been installed in the proper places to allow the water to exit the site, as evidenced during this flow test. dozer00000
(0 votes)
IMG_9059.jpg
Walkway PourIn preparation for the walkway pour there is a rebar mesh put in place with spacing every 20 centimeters. dozer00000
(0 votes)
IMG_9060.jpg
Poured WalkwayThe view after the walkway pour prior to the final smoothing of the concrete. This is hand mix concrete, you can tell it is about the right consistency since there is a minimum of water near the surface, and will become further evident during the final smoothing process. dozer00000
(0 votes)
IMG_9262.jpg
Electric Conduit Run in Drive Way ColumnsThe yellow conduit is laid in place in the left drive way column. The wire strands are in place to support the wall lighting and the door bell.dozer00000
(0 votes)
IMG_9299.jpg
Electric Routed to Wall LightingElectric is routed in the upper perimeter wall ring beam. dozer00000
(0 votes)
IMG_9708.jpg
Heavy Duty Electronic Valve Solenoid ControlMost often you will find water tanks rigged with a toilet float type of on off valve. These cause the pump (in this case a heavy duty submerged franklin) to turn on an off frequently. This wastes electricity and keeps the water 'churning' all the time never giving any impurities time to settle to the bottom. With this type of electronic valve the desired off/on point can be adjusted by moving the middle yellow adjustment tube.dozer00000
(0 votes)
IMG_9712.jpg
Inside of Pump Station Control BoxThis shows the two circuit breakers (for both pumps) and the control unit (on the left) for the submerged Franklin pump.dozer00000
(0 votes)
IMG_9104.jpg
ConduitThe yellow PVC conduit is run as needed in the attic above the ceiling to route electric wire to the associated electric appliance (such as fans, lighting, etc.). dozer00000
(0 votes)
943 files on 79 page(s) 14

Debug Info 
Debug Output: show / hide