Top rated - House Construction |
Power Point OpeningAn opening for a 4 receptacle power point in a designated empty hole within the load bearing wall.
dozer (1 votes)
|
|
Top of Tank FinishingHere the concrete is being poured and finished on top of the tank. It is thick enough to support a motorcycle + car. dozer (1 votes)
|
|
ShowerThe shower, which will be in the corner, has hot and cold piping, the reddish pipe is for hot water.dozer (1 votes)
|
|
Visual Roof InspectionAs long as there is none of the foil insulation which adheres to, and is installed at the same time the cement tiles are installed, the roof can be inspected visually during rain storms for leaks. If the foil has been applied any roof leaks will be much harder to find and repair. dozer (1 votes)
|
|
Render BrushThe brush is used during the render application to sprinkle water on the render as it is starting to dry, then it is polished with a cement trowel.dozer (1 votes)
|
|
CPAC Pour of Ground BeamsCPAC ready mix cement pour of ground beams. 280 KSC (kilometers per square centimeter) concrete was used as in the floor. CPAC is better than hand mix for large areas since it is poured as a homogeneous unit.
dozer (1 votes)
|
|
Footing HoleA footing hole with metal frame work. Each hole was 1 meter square by about 40 cm. deep. In this design there are only two foundation columns in the patio. Throughout the rest of the house there are footing and then a ground beam on top of the footings. The walls are load bearing with columns inside the wall material itself.
dozer (1 votes)
|
|
Ground Beam Rebar FrameThe rebar framework to support the ground beam.
dozer (1 votes)
|
|
External From Front LeftThe roof is a 28% angle. This particular house will be 84 square meters inside, although it looks bigger.dozer (1 votes)
|
|
Upper Strap ConnectionThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. dozer (1 votes)
|
|
Edge Tiles ReplacedThe edge tiles are replaced here without excess space between the tile edge and the fascia board. dozer (1 votes)
|
|
Junction BoxA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer (1 votes)
|
|