A stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer (0 votes)
To prepare for the pour metal rebar (gauge 2 hun) is hand tied into a mesh pattern. (20-Apr-04)dozer (0 votes)
Pour in progress in the front bedroom.dozer (0 votes)
This shows most of the foundation columns as well as the partially finished roof truss. (13-Mar-04)dozer (0 votes)
The cross supports are held in place by wire strands. dozer (0 votes)
The metal substructure which uses 4 hun full guage steel with 3 hun full cross supports. There is additionally another strand placed in the middle of the pour (4 hun full). dozer (0 votes)
The size of the footing of the house depends on many factors. For this house 20 inches is used. (05-Mar-04)dozer (0 votes)
5 people looking at 1 person working. dozer (0 votes)
The cement is poured to anchor the base in place. The depth of this pour is around 20 cm. After this there will be a pour up to ground level which is 60 centimeters wide. Form wood is used as support for this pour.dozer (0 votes)
The foundation post holes are 1 meter square and 1 meter deep. For this house there are 15 foundation posts.dozer (0 votes)