|
Top rated - Original Coolthaihouse Section |
Wall section - notice how there is a base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozer (0 votes)
|
|
Wall section in progress. (13-Mar-04)dozer (0 votes)
|
|
Shaping the driveway. (27-Jun-04)dozer (0 votes)
|
|
For outside surfaces that will not be tiled, they can be done is a semi-smooth, non slippery, finish. (04-Jun-04)dozer (0 votes)
|
|
A smoothing tool is used to correctly level and slope the patio. (03-Jun-04)dozer (0 votes)
|
|
Hand mixing concrete for the carport pour. (18-May-04)dozer (0 votes)
|
|
The carport pour is 20 centimeters thick.dozer (0 votes)
|
|
Great room nearly complete.dozer (0 votes)
|
|
Pour close up. (21-Apr-04)dozer (0 votes)
|
|
Pour in the great room in progress.dozer (0 votes)
|
|
The still wet surface is 'roughed' in preparation for tiling. (20-Apr-04)dozer (0 votes)
|
|
A tile mesh pattern is created above the sand flooring.dozer (0 votes)
|
|
749 files on 63 page(s) |
|
|
|
|
|
|
|
|
61 | |
|
|
|
|