|
Top rated - Original Coolthaihouse Section |
A finished off deep water well. (15-Apr-04)dozer (0 votes)
|
|
Sometimes once water is hit some circular drainage fittings will be inserted prior to pumping out water, as in this picture. Although it doesn't look like it in this picture, the well digger is about 7 meters below ground level here! (09-Apr-04)dozer (0 votes)
|
|
Once the wells starts getting deep the digger will descent using a rope. (09-Apr-04)dozer (0 votes)
|
|
Deep Water Well: A rig at work drilling a deep water well. (03-Apr-04)dozer (0 votes)
|
|
Painted and finished wall section with decorative security metal. (15-Aug-04)dozer (0 votes)
|
|
Another thing worth noting. If cheap paint is used on wall sections it will not last long. This section was just painted a few weeks before. (25-Jul-04) dozer (0 votes)
|
|
A close up showing that the post was poured before the blocks were laid in, not after.dozer (0 votes)
|
|
You can see from a close examination of this wall section that the post was not correctly poured around the blocks. (14-Jul-04) dozer (0 votes)
|
|
WALL EXAMINATION: A good enough looking wall section but can you notice two things? The posts are far apart (3.5 meters) and the fact that you can see the imprint of the underlying blocks indicates that the stucco layer applied was very thin. (06-Jul-04)dozer (0 votes)
|
|
Finished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer (0 votes)
|
|
This application was finished off with two main entry posts and an entry gate. A layer of bricks was used on top of these prefabricated entry posts for an artistic look. (06-Jul-04).dozer (0 votes)
|
|
Finishing touches applied to the top of the perimeter wall foundation post.dozer (0 votes)
|
|
749 files on 63 page(s) |
|
|
|
|
6 | |
|
|
|
|
|
|
|
|