happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Top rated - Original Coolthaihouse Section
DSC02134~0.jpg
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozer00000
(0 votes)
DSC02133.jpg
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer00000
(0 votes)
DSC02116.jpg
Partially finished counter with supporting brick columns.dozer00000
(0 votes)
DSC02113.jpg
The counter will be supported by red brick columns. (13-May-04)dozer00000
(0 votes)
DSC02009.jpg
The counter after the cement pour. (27-Apr-04)dozer00000
(0 votes)
DSC02008.jpg
Pouring cement to form the counter.dozer00000
(0 votes)
DSC02002.jpg
The red bricks designate where the sink will go. dozer00000
(0 votes)
DSC02001.jpg
The metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer00000
(0 votes)
DSC06003.jpg
The completed section over the carport. (28-Aug-04)dozer00000
(0 votes)
DSC05037.jpg
A completed and painted section in the rear of the house. (08-Jul-04)dozer00000
(0 votes)
DSC04016.jpg
Above the patio. (12-Jun-04)dozer00000
(0 votes)
DSC03023.jpg
The partially completed section over the parking spot. (21-May-04)dozer00000
(0 votes)
749 files on 63 page(s) 42

Debug Info 
Debug Output: show / hide