happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Top rated - Original Coolthaihouse Section
DSC04081.jpg
The top shows the heavy duty bathtub drain assembly which was purchased separately for about 1700 Baht. On lower portion shows the default drain assembly which comes with the bathtub. You wouldn't want to use this plastic type. (23-Jun-04)dozer00000
(0 votes)
DSC04073.jpg
Partially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer00000
(0 votes)
DSC04063.jpg
The bathtub will be supported by this brick enclosure.dozer00000
(0 votes)
DSC04062.jpg
The large bathroom cabinet. dozer00000
(0 votes)
DSC04061.jpg
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozer00000
(0 votes)
DSC04057.jpg
Cabinet in progress in the large bathroom. (21-Jun-04)dozer00000
(0 votes)
DSC04054.jpg
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer00000
(0 votes)
DSC04053.jpg
Completed and tiled shower enclosure base. (20-Jun-04)dozer00000
(0 votes)
DSC04043.jpg
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer00000
(0 votes)
DSC04021~0.jpg
The plumber is applying tile grout. (14-Jun-04)dozer00000
(0 votes)
DSC04011.jpg
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer00000
(0 votes)
DSC04006.jpg
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer00000
(0 votes)
749 files on 63 page(s) 38

Debug Info 
Debug Output: show / hide