happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Top rated - Original Coolthaihouse Section
DSC01043.jpg
The well rings which are inserted in the finished well come in various diameters, the ones used here are 1.2 meters. dozer00000
(0 votes)
DSC01041.jpg
5 Minutes Saved, the Story of DIRTY WATER!: The well was dug in February, and although I don't have any pictures it was hand dug by an experienced well digger. This shot shows a well digger descending into a hand dug well. The well in our case is about 7 meters deep and uses 23 rings. (09-Apr-04)dozer00000
(0 votes)
DSC05122.jpg
Painted and finished wall section with decorative metal. (15-Aug-04)dozer00000
(0 votes)
DSC05018.jpg
Finished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer00000
(0 votes)
DSC04143.jpg
Finishing touches applied to the top of the perimeter wall foundation post.dozer00000
(0 votes)
DSC04142.jpg
Stucco being applied to the perimeter wall.dozer00000
(0 votes)
DSC04140.jpg
Laying a brick in place.dozer00000
(0 votes)
DSC04139.jpg
To apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozer00000
(0 votes)
DSC00040~0.jpg
A wall section (front and side) with completed support post structures. dozer00000
(0 votes)
DSC00039.jpg
The support post is poured around the adjacent blocks using a form structure. dozer00000
(0 votes)
DSC00037.jpg
Another view of the back wall. dozer00000
(0 votes)
DSC00036.jpg
This is the entry way for the walk in gate. dozer00000
(0 votes)
749 files on 63 page(s) 33

Debug Info 
Debug Output: show / hide