 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Village House

Top rated - Village House
P8010334.JPG
dozer00000
(0 votes)
IMG_8490.jpg
The poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozer00000
(0 votes)
IMG_8491.jpg
3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozer00000
(0 votes)
IMG_8485.jpg
The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozer00000
(0 votes)
IMG_8518.jpg
Existing section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozer00000
(0 votes)
IMG_8517.jpg
The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer00000
(0 votes)
IMG_8515.jpg
On 40 meter section prior to completion. dozer00000
(0 votes)
IMG_8514.jpg
One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer00000
(0 votes)
IMG_8513.jpg
Sprinkling water on the wall surface during the rendering process. dozer00000
(0 votes)
IMG_8505.jpg
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer00000
(0 votes)
IMG_8502.jpg
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer00000
(0 votes)
IMG_8484.jpg
Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer00000
(0 votes)
35 files on 3 page(s) 1