happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Info > Basics

Top rated - Basics
DSC03132~0.jpg
Wall tile is laid much the same way. This example shows bathroom wall tile being set in place. The wall is scored and pure cement is for maximum adhesion. (03-Jun-04)dozer00000
(0 votes)
DSC03057~0.jpg
Some places require small tile fragments to be laid to complete the area.dozer00000
(0 votes)
DSC03051~0.jpg
After the cement is dry, tile grout is applied. The grouts come in various colors to match the shade of the tile. (24-May-04)dozer00000
(0 votes)
DSC02149~1.jpg
Here the next tile is set in place. dozer00000
(0 votes)
DSC02148~0.jpg
Each tile is carefully tapped into place. (14-May-04)dozer00000
(0 votes)
DSC02117~0.jpg
Here is the front bedroom partially tiled. dozer00000
(0 votes)
DSC02114~0.jpg
This shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozer00000
(0 votes)
DSC02112~0.jpg
Here a tile is being set in place.dozer00000
(0 votes)
DSC02111~0.jpg
After the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer00000
(0 votes)
DSC01153~0.jpg
The traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer00000
(0 votes)
DSC01070~0.jpg
The foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer00000
(0 votes)
DSC01067~0.jpg
Stucco applied to the front of the house. (19-Apr-04)dozer00000
(0 votes)
127 files on 11 page(s) 6

Debug Info 
Debug Output: show / hide