happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > larrywawfelix

Top rated - larrywawfelix's Gallery
404_corner_view_2.jpg
larrywawfelix00000
(0 votes)
202_front_view.jpg
front veranda / balconydont know if u can call it a balcony for one floor lol but its 13 mtrs long by 3 mtr wide should be nice when tiled and i can lay outside in the evenings and feed the mozzies
larrywawfelix00000
(0 votes)
90_water_tank_view.jpg
we have 2 k ltr fresh / rain water storage and 2 k ltr waste storage for garden use. will try to make well but told not good area.larrywawfelix00000
(0 votes)
70_basement_floor_stair_area.jpg
basement being cementedwe will have a fully tanked reasonable waterproof and secure basement for storage and for standby generator etclarrywawfelix00000
(0 votes)
40_front_steps.jpg
front steps in constructionnice wide front steps for such a small project lets see what it looks like when its tiledlarrywawfelix00000
(0 votes)
33_deep_floor_view.jpg
hot tub areathis low floor area will eventually house a hot tub and usual w/c showerlarrywawfelix00000
(0 votes)
24_conservatory.jpg
rear patio/conservatorythis was originally intended to be just a 1 mt ledge for aircon gear and washing machine. but it has been extended to rear fence wall will have sliding windows to construct a nice 13 mtr x 3 conservatorylarrywawfelix00000
(0 votes)
20_right_hand_wall.jpg
larrywawfelix00000
(0 votes)
8_tanks_under_floor.jpg
larrywawfelix00000
(0 votes)
6_floor_and_posts.jpg
larrywawfelix00000
(0 votes)
3_women_at_work.jpg
larrywawfelix00000
(0 votes)
1_start_of_ground_works.jpg
this was the first delivery of materials one thing i like abt hua hin is even though these pics were taken over monsoon season the sun is always shining...larrywawfelix00000
(0 votes)
12 files on 1 page(s)

Debug Info 
Debug Output: show / hide