DSC00132~1.jpg
Wall section - notice how there is a level base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozer00000
(0 votes)
DSC00105~1.jpg
Wall section in progress. (13-Mar-04)dozer00000
(0 votes)
DSC04135~0.jpg
Shaping the driveway. (27-Jun-04)dozer00000
(0 votes)
DSC03145~0.jpg
Outside surfaces that will not be tiled can be done is a semi-smooth, nonslippery, finish. (04-Jun-04)dozer00000
(0 votes)
DSC03130~0.jpg
A smoothing tool is used to correctly level and slope a patio pour. (03-Jun-04)dozer00000
(0 votes)
DSC03003~0.jpg
Hand mixing concrete for a carport pour. (18-May-04)dozer00000
(0 votes)
DSC03002~0.jpg
The carport pour in this example is 20 centimeters thick.dozer00000
(0 votes)
DSC01125.jpg
Metal is used to add strength to the floor. The metal that comes in rolls is cheaper but is not very good and should be avoided if possible.dozer00000
(0 votes)
DSC01120~0.jpg
A large pour nearly complete.dozer00000
(0 votes)
DSC01105~0.jpg
Pour close up. (21-Apr-04)dozer00000
(0 votes)
DSC01104~0.jpg
Pour in a room in progress.dozer00000
(0 votes)
DSC01103~0.jpg
The still wet surface is 'roughed' with a broom in preparation for tiling. (20-Apr-04)dozer00000