happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Info

Top rated - Original Coolthaihouse Info
DSC05125~2.jpg
The front gutter system. (15-Aug-04)dozer00000
(0 votes)
DSC05121~1.jpg
The rear gutter and down spout.(13-Aug-04)dozer00000
(0 votes)
DSC05080~0.jpg
Added the final gutter on top of the patio. (23-Jun-04)dozer00000
(0 votes)
DSC05042~0.jpg
Interconnected gutters. (19-Jun-04)dozer00000
(0 votes)
DSC05037~2.jpg
Brackets.dozer00000
(0 votes)
DSC05036~0.jpg
A completed gutter section. (18-Jun-04)dozer00000
(0 votes)
DSC05029~0.jpg
Installing brackets for the 6" gutter sections. (16-Jun-04)dozer00000
(0 votes)
DSC05151~1.jpg
View of planter boxes from patio. (22-Aug-04)dozer00000
(0 votes)
DSC05115~0.jpg
The resulting paving stone walkway. (12-Aug-04)dozer00000
(0 votes)
DSC05104~0.jpg
The paving stones are set in place.dozer00000
(0 votes)
DSC05103~0.jpg
Fine sand is leveled. (31-Jul-04)dozer00000
(0 votes)
DSC05041~0.jpg
Side planter box.dozer00000
(0 votes)
329 files on 28 page(s) 1

Debug Info 
Debug Output: show / hide