|
Top rated - Colorado's Gallery |
The Half-Rai organic farmJust the bit of farmed ground up to, but not including the big tamarind tree. A bit of a shed there, which fronts the road on the NE corner of the property.Colorado (0 votes)
|
|
Excavation for footings - 8 Oct 2011A bit of foundation digging and the 15cm of fertile topsoil has disappeared.Colorado (0 votes)
|
|
View of property from NEGoes up to the trees, but not into them. We are surrounded by green for now, but sure that will change. So building to have internal gardens to view.Colorado (0 votes)
|
|
First footing excavation - 5 Oct 2011About 15cm of topsoil supported this organic farm, below is all hard packed sand. Smooth digging.Colorado (0 votes)
|
|
House FloorplanActually 2 houses under 1 roof with a kitchen/breezeway separating them. N house is a mother-in-law apartment.Colorado (0 votes)
|
|
Land LayoutOur 1/2 rai. 17-18m by 40-47m. N is up. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. Colorado (0 votes)
|
|
|
|
Lot Layout N-upOur 1/2 rai. Right-side-up (until I figure out how to delete the upside-down one). 17-18m by 40-47m. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. Colorado (0 votes)
|
|
Lot LayoutOur 1/2 rai. Upside-down (N is to the bottom). 17-18m by 40-47m. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. Colorado (0 votes)
|
|
Floor planActually 2 houses under 1 roof, separated by a covered breezeway/kitchen. N house is to front of property, a mother-in-law apartment... though we'll squeeze in Mom & Dad.Colorado (0 votes)
|
|
|
|
|
|
|