|
Top rated - kknaj's Gallery |
Center of the houseThis view is from the window beside the front door looking into the living room. kknaj (0 votes)
|
|
Looking GoodThis front side view is a great angle to show the design of the roof before tiles are laid. Here the walls are about 90% complete. Here the front windows are 2 meters hight x 2.5 meters wide.kknaj (0 votes)
|
|
Landscape designI made this landscape design to show the builder the overall plan. As well as making it ready to give to the future landscaper.kknaj (0 votes)
|
|
Progress so farThis picture shows the Roof steel is nearly complete and the walls have started. The builder is so eager to keep going that they are doing the walls at the same time as the roofers working. At the moment there are up to 14 people working on the site.kknaj (0 votes)
|
|
Internal WallsFront door frame and back door wall space. Originally the idea was to use the cement blocks for internal walls. However the builder asked for and we delivered too many red bricks (12,000 x 1 baht each) which looks like its enough to do all internal and external walls. The windows are larger than normal for this design which may account for his confusion. Either way I'm not fussed as the price works out to be about the same and with a fixed price for the building there is no extra cost.kknaj (0 votes)
|
|
Pillar form workThe builders are preparing the wooden form work before pouring the cement.kknaj (0 votes)
|
|
Completed PillarsThese pillars seem to be larger than I thought they would be. All the better they look better from outside. For my design all internal walls are flat without pillars. the external walls will show the pillarskknaj (0 votes)
|
|
PlumbingOnce the foundations and pillars were complete the builders dug out the dirt to place all the PVC plumbing for sinks, toilets and taps. I had to be there to point out the missing items. They don't seem to understand the architectural plans too well so it is important to be there are show where the missing items should go. This includes putting the shower drain under the shower, not on the other side of the room.kknaj (0 votes)
|
|
Roof support systemThis view shows more clearly the double thickness support structure. 2 beams welded togetherkknaj (0 votes)
|
|
Roofing structureThis is the start of the roofing structure. The outside and internal beams are doubled up and welded togetherkknaj (0 votes)
|
|
Closer up view of foundations near kitchen and bathroomskknaj (0 votes)
|
|
Cementing of foundations40cm high foundationskknaj (0 votes)
|
|
|
|
|
|