Ground floor with damp proof and mesh laidchangnoi (0 votes)
|
|
Mums bedroom and Ensuite after the concrete pourchangnoi (0 votes)
|
|
Prep for downstairs WCThis shows the pipework installed prior to the concrete pourchangnoi (0 votes)
|
|
Upper Ring Beam JointA stunning example of ring beam work.changnoi (0 votes)
|
|
A quick shot of DB bending!!changnoi (0 votes)
|
|
After the Groundfloor has set we start the wallsNo hanging around here straight on with starting the walls this weekend.changnoi (0 votes)
|
|
Prep for Concrete PourThis view shows the prep going on prior to the pour of concrete and shows where the balconey will be on the side of the house. This area along with all bathrooms will be poured seperately as it will be lower than the ground floor with a slight slope for water drainage.changnoi (0 votes)
|
|
Groundfloor CastThis was the day after the concrete pour and already hard so started building wallschangnoi (0 votes)
|
|
Formwork for uner neath the Upper Ring Beamschangnoi (0 votes)
|
|
View of the metalwork for Upper Ring Beamschangnoi (0 votes)
|
|
From the back to the frontchangnoi (0 votes)
|
|
A View through the lounge areaCan you see it I can, the lounge then after that the deck area, then Mum's room etc etcchangnoi (0 votes)
|
|