happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > changnoi

Top rated - changnoi's Gallery
GF_filled_with_damp_proof_pegs_and_mesh.jpg
Ground floor with damp proof and mesh laidchangnoi00000
(0 votes)
gf_mum_bedroom_with_bathroom_pit.jpg
Mums bedroom and Ensuite after the concrete pourchangnoi00000
(0 votes)
GF_WC_with_pipes.jpg
Prep for downstairs WCThis shows the pipework installed prior to the concrete pourchangnoi00000
(0 votes)
beam_joint.jpg
Upper Ring Beam JointA stunning example of ring beam work.changnoi00000
(0 votes)
bending_db1.jpg
A quick shot of DB bending!!changnoi00000
(0 votes)
building_walls.jpg
After the Groundfloor has set we start the wallsNo hanging around here straight on with starting the walls this weekend.changnoi00000
(0 votes)
GF_balconey.jpg
Prep for Concrete PourThis view shows the prep going on prior to the pour of concrete and shows where the balconey will be on the side of the house. This area along with all bathrooms will be poured seperately as it will be lower than the ground floor with a slight slope for water drainage.changnoi00000
(0 votes)
GF_cast.jpg
Groundfloor CastThis was the day after the concrete pour and already hard so started building wallschangnoi00000
(0 votes)
wk7-11.jpg
Formwork for uner neath the Upper Ring Beamschangnoi00000
(0 votes)
wk7-12.jpg
View of the metalwork for Upper Ring Beamschangnoi00000
(0 votes)
wk7-13.jpg
From the back to the frontchangnoi00000
(0 votes)
wk7-6.jpg
A View through the lounge areaCan you see it I can, the lounge then after that the deck area, then Mum's room etc etcchangnoi00000
(0 votes)
406 files on 34 page(s) 29

Debug Info 
Debug Output: show / hide