Starting the Ground floor pour from the backMums bedroom and ensuite areachangnoi (0 votes)
Used Euka Poles in LH AlleyThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoi (0 votes)
Right Hand Alley full of Euka Poles from ScaffoldingThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoi (0 votes)
Mums Ensuite before Concrete Pourchangnoi (0 votes)
View of whole groundfloor after concrete pourThis shows the groundfloor after the pour from the back to the front on the right where the wc will bechangnoi (0 votes)
Ground floor WC after concrete pourchangnoi (0 votes)