happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > changnoi

Top rated - changnoi's Gallery
starting_the_GF_pour_3.jpg
Starting the Ground floor pour from the backMums bedroom and ensuite areachangnoi00000
(0 votes)
more_Used_Euka_poles_in_lh_alley.jpg
Used Euka Poles in LH AlleyThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoi00000
(0 votes)
more_Used_Euka_poles_in_rh_alley.jpg
Right Hand Alley full of Euka Poles from ScaffoldingThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoi00000
(0 votes)
Mum_s_Ensuite_area.jpg
Mums Ensuite before Concrete Pourchangnoi00000
(0 votes)
prep_GF_balconey.jpg
Prep for GF balconeychangnoi00000
(0 votes)
RB_with_formwork_removed.jpg
Ringbeams with framework removedchangnoi00000
(0 votes)
GF_WC_with_pipes_2.jpg
Prep for GF WC with pipeschangnoi00000
(0 votes)
height_pegs.jpg
Height Sticks for Concrete Pourchangnoi00000
(0 votes)
installing_dpc_2.jpg
Damp Proofing preparationchangnoi00000
(0 votes)
installing_dpc___mesh_4.jpg
Installing Damp Proofing & Meshchangnoi00000
(0 votes)
GF_cast_4_with_wc_pit.jpg
View of whole groundfloor after concrete pourThis shows the groundfloor after the pour from the back to the front on the right where the wc will bechangnoi00000
(0 votes)
GF_cast_4_with_wc_pit___pipes.jpg
Ground floor WC after concrete pourchangnoi00000
(0 votes)
406 files on 34 page(s) 28

Debug Info 
Debug Output: show / hide