Initial columns starting to get erected.Makes a big difference to the landscape once the metal trees start growing.changnoi (1 votes)
|
|
10th October some more preperationFront wall completely gone along with gate and old water tank. In the middle ground left hand side you can see the topp of the well which we are going to use for when the council supply fails. It will get plumbed into the watertank along with a pump. We saw a great square water tank, looks like brick at HomePro, made by DOS. Sadly only 900 litres whereas we could do with one that is 1200.changnoi (1 votes)
|
|
First attempt at sandstone claddingNot quite what we had in mind so down it comes and start againchangnoi (1 votes)
|
|
Tile Planning Yes that is an actual Plan that is being used OMGchangnoi (1 votes)
|
|
Across the site viewing columns and boxworkchangnoi (1 votes)
|
|
Caprort entrance looking outchangnoi (1 votes)
|
|
Central Walkway showing carport behind cement pilechangnoi (1 votes)
|
|
Wow Up & AwayThis week the site is transformed with the ground beams and the columns being surrounded by the wooden boxwork, awaiting for their concrete pour.changnoi (1 votes)
|
|
|
|
Side View from Front Leftchangnoi (1 votes)
|
|