|
Top rated - somdet's Gallery |
back porch bench railingTried to think of a better word for this, but couldn't. It's where I'll be a-settin' of an evenin'. Poured cement will be finished with tiles.somdet (0 votes)
|
|
Wooden floors going downThe wood is a little disappointing, and that's all I want to say, because it pains me to even think about it at the moment.somdet (0 votes)
|
|
Girls' bathroom tilesThis was the first main blunder by the workers. There are pink tiles that are supposed to go on the bottom (under the thin colorful row) but the guys just couldn't contain themselves and went ahead with their own plan. Luckily they took them off one by one, and re-did it correctly.somdet (0 votes)
|
|
West facing sideWe decided to cement this in to make it less messy. There will be a carport at the front (background) and laundry area in the back (foreground). somdet (0 votes)
|
|
The front stepsThings are starting to take shape.somdet (0 votes)
|
|
Shower wall of glass blocksThis is taken from our bedroom doorway looking through the closet into the bathroom. somdet (0 votes)
|
|
rendering the wallAfter taking an 8 day break, they did almost the entire wall in one day ( about 130 meters).somdet (0 votes)
|
|
roof tilesThese are CPAC Monier Zeason tiles. The color is Winter Gray. They cost 18 baht a piece. The apparent difference in size is just an optical illusion created by the height of the stacks of tiles.somdet (0 votes)
|
|
Getting thereAbout 90% of the shell is done. Next steps are tiles, plumbing and painting.somdet (0 votes)
|
|
roof tilesThe roof went up in about three days while I was out of town. It's about 90% finished but we are waiting on more tiles.somdet (0 votes)
|
|
|
entranceHaving glass block instead of the whole entry window treatment saved us quite a bit.somdet (0 votes)
|
|
109 files on 10 page(s) |
|
|
|
|
|
|
|
9 |
|
|
|
|