Top rated - Thaifu T's Gallery
100_0247.JPG
Example of Thai brick work. Bricks tied to columns by means of drilling into concrete and inserting steel rods. Note the horizontal 'beam' on the other side of the scaffolding, this is re-infirced and adds strength.Thaifu T33333
(2 votes)
100_0227.JPG
Brickwork started - this will eventually become the main bedroom.Thaifu T33333
(2 votes)
100_0226.JPG
Upper columns ready for concrete. Still using the metal shuttering. Plenty of bagged cement has been delivered ready to start the brickwork.Thaifu T11111
(2 votes)
100_0404.JPG
My final view of the house before having to return to the UK. Actually I am very pleased with the progress that has been made over the past 13 weeks - but don't tell the builder I said that.Thaifu T00000
(2 votes)
100_0401.JPG
An upstairs bedroom, ready for a few coats of paint.Thaifu T00000
(1 votes)
100_0400.JPG
Upstairs toilet - waiting for a clean and some water to be connected.Thaifu T00000
(1 votes)
100_0399.JPG
How NOT to hang a door - these hinges stand out from the door by at least half an inch, I will not repeat my comments to the builder.Thaifu T00000
(1 votes)
100_0398.JPG
Living room, looking toward the front door. Painting of ceiling has started. 'Squaring off' the concrete work on the stairs, wood will be added later.Thaifu T00000
(1 votes)
100_0396.JPG
Master bedroom now ready for paintingThaifu T00000
(1 votes)
100_0393.JPG
Finishing off the patio tiling. Column brickwork finished.Thaifu T00000
(1 votes)
100_0392.JPG
Living room - looking out toward the patio.Thaifu T00000
(1 votes)
100_0390.JPG
Working on the columns for the entrance. Weatherboard now fitted to the roof.Thaifu T00000
(1 votes)
57 files on 5 page(s) 1