Top rated - Thaifu T's Gallery |
Example of Thai brick work. Bricks tied to columns by means of drilling into concrete and inserting steel rods. Note the horizontal 'beam' on the other side of the scaffolding, this is re-infirced and adds strength.Thaifu T (2 votes)
|
|
Brickwork started - this will eventually become the main bedroom.Thaifu T (2 votes)
|
|
Upper columns ready for concrete. Still using the metal shuttering. Plenty of bagged cement has been delivered ready to start the brickwork.Thaifu T (2 votes)
|
|
My final view of the house before having to return to the UK. Actually I am very pleased with the progress that has been made over the past 13 weeks - but don't tell the builder I said that.Thaifu T (2 votes)
|
|
An upstairs bedroom, ready for a few coats of paint.Thaifu T (1 votes)
|
|
Upstairs toilet - waiting for a clean and some water to be connected.Thaifu T (1 votes)
|
|
How NOT to hang a door - these hinges stand out from the door by at least half an inch, I will not repeat my comments to the builder.Thaifu T (1 votes)
|
|
Living room, looking toward the front door. Painting of ceiling has started. 'Squaring off' the concrete work on the stairs, wood will be added later.Thaifu T (1 votes)
|
|
Master bedroom now ready for paintingThaifu T (1 votes)
|
|
Finishing off the patio tiling. Column brickwork finished.Thaifu T (1 votes)
|
|
Living room - looking out toward the patio.Thaifu T (1 votes)
|
|
Working on the columns for the entrance. Weatherboard now fitted to the roof.Thaifu T (1 votes)
|
|