Top rated - Chok Dee #2
IMG_9071.jpg
Smoothing the RenderAfter setting in a bit more the surface is worked smooth with the use of a render's darby in combination with a wet sponge. dozer00000
(0 votes)
IMG_9075.jpg
Finished SurfaceThis is the finished surface after smoothing. Close examination ensures that no hairline cracks are present. Cracking is a sign of improper rendering, either via improper mixing or application. dozer00000
(0 votes)
IMG_9086.jpg
Glass Blocks OffsetThe exterior bathroom wall showing the glass blocks have been laid in place to be level with the exterior wall after the 2.5 centimeter of render is applied. dozer00000
(0 votes)
IMG_9088.jpg
Surface Prep for Wall TilesThe surface here is being prepped for wall tiles. dozer00000
(0 votes)
IMG_9195.jpg
Kitchen Cabinets FormationShows the kitchen cabinets which are constructed of red bricks being formed. The walls of the kitchen have been roughed to 1.5 meters to allow for the wall tiles. dozer00000
(0 votes)
IMG_9005.jpg
Column SquaringThe rough columns will be squared. Here a fishing line is run vertically down to a concrete nail in the floor which indicates the target line for the corner of the column, the lines indicate the external edges. dozer00000
(0 votes)
IMG_9190.jpg
Wall Ground BeamThere are footings at approximately 2.5 meter intervals below this beam that is being poured. Notice the column frames extending from the beam.dozer00000
(0 votes)
IMG_9218.jpg
Wall ColumnsAs always, the columns for the perimeter wall are poured after the blocks are laid. This ties the blocks into the column and is much more durable.dozer00000
(0 votes)
IMG_9269.jpg
Openings in the WallThese opening in the perimeter wall let some light in and give the garden area a nicer feel that if the wall was solid.dozer00000
(0 votes)
IMG_9322.jpg
Initial Render CoatAn initial render coat will be applied and left rough. This then is allowed to dry over a period of time, prior to applying the colored render coat.dozer00000
(0 votes)
IMG_9668.jpg
Palms PlantedA bit of a garden on the right side of the driveway.dozer00000
(0 votes)
IMG_9466.jpg
Wall CleaningSpots from construction debris can be washed off the colored concrete using water and a pad.dozer00000
(0 votes)