Front viewAll we need now is a nice garden around it and some sleek stainless steel railings round the patios. We're waiting for good weather to apply the cladding to the porch pillars. The House Registration Certificate was delivered by the Or Bor Dor on 2 June 2008 for 20 baht. At no time were we required to apply for planning or construction permissions, no blueprints were required, and no money ever changed hands.
Click thumbnail to see an enlargement then click the little clapperboard to start a slide show (without descriptions) of all the pics in the file.jazzman (8 votes)
|
|
Bathroom wall tiles.Been trying for several days to get cheap tiles, but the prices seem to have gone up considerably since I built my house. I really wanted white, but I was not prepared to pay 160 baht / m2 or more for the cheapest plain white tiles I could find. I was able to negotiate 123 baht / m2 for 54 m2 of these very light green ones.
It is not necessary to render the walls first.jazzman (6 votes)
|
|
|
|
Main bathroomNot grouted yetkknaj (1 votes)
|
|
First delivery of cementThe first delivery of rebar and some concrete mix to site.
The "macro" is in the background ready to dig.Max&Bee-in-CM (1 votes)
|
|
Jan.30,2010Almost finished but this is the view of the piping both water and electric.pklongball (1 votes)
|
|
July 10An overview of the bath and shower todaypklongball (1 votes)
|
|
July 10Here we have the master bath shower unit installed. This is a Hang Co unit. Combo rain head and hand held sprayer.pklongball (1 votes)
|
|
|
Quality wiringThis is a major wiring junction in the roof space. Wires twisted together with insulating tape and no junction box.jazzman (1 votes)
|
|
DownlightWe used these recessed ceiling downlights throughout the house. They'll take normal bulbs or energy-savers. Cost: Baht 38 each in GlobalHouse.jazzman (1 votes)
|
|