|
Top rated - User galleries |
|
|
trees arrive ....first of 6 loadsthaifly (1 votes)
|
|
First floor columns are being fitted with formsRick B (1 votes)
|
|
Blocks installed on top of ground level beam to enclose the crawl spaceRick B (1 votes)
|
|
|
|
view from main housethaifly (1 votes)
|
|
|
Car portThis is another cost saver that looks like crap. I had asked for a different color, but somehow the contractor "forgot." Really, it's just a place to keep my ride out o' the rain. somdet (1 votes)
|
|
The front of the houseA coat of primer has been slapped on. The driveway is finished. It's starting to look like a house.somdet (1 votes)
|
|
More superb engineeriing.Click the image for a full screen view. A load-bearing concrete corner column. Notice how the whole weight of the corner of the roof rests on the too thin rebar of the columns that were made too short. The ring-beam is only a single c-section 4 x 4 steel girder; it should at least be a box section - better would bee two C-sections welded face-to-face. Viewed from the outside, the tiles lifting up a couple of milimetres at their bottom edges demonstrates that the roof is sagging already.jazzman (8 votes)
|
|
5254 files on 438 page(s) |
|
|
|
|
6 | |
|
|
|
|
|
|
|
|