happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Top rated - User galleries
DSCF4634_(2).JPG
entrancei'm not sure i did me sums right, perhaps i should buy an artic lorry to justify the entrance. (5m) ;+)mikey307300000
(0 votes)
DSCF4632(2)_-_Copy.JPG
finished inside viewoh dear, that's gonna be a lorra gardeningmikey307300000
(0 votes)
DSCF4621_-_Copy.JPG
finished viewlooks ok from a distance ;-omikey307300000
(0 votes)
DSC02179_-_2nd_Floor_Beams_-_012108.JPG
Second floor beams after being poured looking at the back of the house (on left) and the side deck (on right). Note, the columns without second floor beams are single-storey columns and will support the lower roof sections over the side deck and the Thai kitchen in the rear.Rick B00000
(0 votes)
DSC02164_-_Floor_Slabs_-_010808.JPG
Floor slabs being laid over first floor beams. The 6mm rebar seen embedded into the floor beams will be bent over the floor slabs and tied to the wire mesh laid over the floor slabs prior to pouring an additional 5cm of concrete on top of the floor slabs. This makes the finished floor ~ 10cm thick.Rick B00000
(0 votes)
DSC02175_-_Floor_Slabs_-_010908.JPG
Floor slabs (pan peun) are being laid for the first floor. These slabs will be covered with wire mesh and an additional 5cm of poured concrete.Rick B00000
(0 votes)
DSC02177_-_2nd_Floor_Beams_-_012108.JPG
Rebar and forms for the second floor beams are bing assembled.Rick B00000
(0 votes)
DSC02148_-_FIrst_Floor_Columns_-_122807.JPG
First floor columns' forms are being assembled after the floor beams were completed.Rick B00000
(0 votes)
DSC02154_-_First_Floor_Foundations_-_010808.JPG
First floor beams are ready for the floor slabs (pan peun)Rick B00000
(0 votes)
DSC02160_-_Floor_Sabs_-_010808.JPG
Pre-stressed floor slabs for the first floor are being delivered direct from the factoryRick B00000
(0 votes)
DSC02094_-_First_Floor_Foundations_-_121507.JPG
Rebar for the first floor beams is being assembled in place.Rick B00000
(0 votes)
DSC02117_-_First_Floor_Foundation_-_122107.JPG
Forms and rebar for the first floor beams are ready for the concrete pour.Rick B00000
(0 votes)
5254 files on 438 page(s) 420

Debug Info 
Debug Output: show / hide