happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Top rated - User galleries
DSC02315_-_Installing_Roof_Steel_-_030108.JPG
Upper Roof SteelThe upper roof support steel is in place. This work took about one week from start to this point.Rick B00000
(0 votes)
DSC02327_-_Roof_Steel_-_030708.JPG
Installing Roof Tile BattensThese two guys are up 10 meters in the air. I don't even want to think about the safety issues that were ignored here!Rick B00000
(0 votes)
DSC02366_-_Upper_Roof_-_031008.JPG
Upper RoofReflective foil and roof tiles are being laid in place.Rick B00000
(0 votes)
DSC02425_-_Second_Floor_Blockwork_-_032608.JPG
Upper Roof Nearing CompletionAll but the edge tiles over the front roof are now installed on the upper roof. Second floor block work and window/door frames are also complete.Rick B00000
(0 votes)
DSC02279_-_Installing_Roof_Steel_-_022608.JPG
Upper Roof StartingAfter the second floor was poured, they began installing the upper roof steel. Rick B00000
(0 votes)
DSC02253_-_Front_Blockwork_Finished_-_022308.JPG
Front of House with First Floor BlockworkWindow and door frames and blockwork for the first floor nearing completion.Rick B00000
(0 votes)
DSC02235_-_Living_Room_Front_Window_-_022108.JPG
Living Room Front WindowThis window frame will have four opening windows and a non-opening glass center.Rick B00000
(0 votes)
DSC02233_-_Living_Room_Side_Window_-_022008.JPG
Alligning Window FrameWe used mai takien for our frames and windows. Here they're alligning one of the living room windows before cementing it in place.Rick B00000
(0 votes)
DSC02208_-_ProBlock_on_West_Side_-_021308.JPG
View of Side and Rear of HouseProBlock being layed for first floor exterior walls.Rick B00000
(0 votes)
DSC02190_-_Wall_Next_To_Stairs_-_020908.JPG
Interior Walls StartingStarting to lay block for the interior walls. Staircase to the second floor is behind worker and will eventually be covered with wooden steps.Rick B00000
(0 votes)
DSC02221_-_Prior_to_Installing_Doors___Windows_-_021908.JPG
Second Floor Columns CompletedThe upper columns are complete and installation of the outer block walls is underway using ProBlock. Detached garage is under construction in front of the house.Rick B00000
(0 votes)
DSC02223_-_Kitchen_Prior_to_Installing_Window_-_021908.JPG
Kitchen Before WindowsProBlock (similar to SuperBlock and sold by HomeMart) on outer wall and opening ready for installation of window frame.Rick B00000
(0 votes)
5254 files on 438 page(s) 419

Debug Info 
Debug Output: show / hide