29 Jan. 2009The install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball (0 votes)
29 Jan. 2009This view shows the newly added black tubing that is part of a termite control system. Installed today.pklongball (0 votes)
29 Jan. 2009Overview of the site just after the first delivery of floor panels.pklongball (0 votes)
29 Jan. 2009The crew is taking a short break waiting for the next batch of concrete from the mixer.pklongball (0 votes)
29 Jan. 2009This view shows the floor panels near the back of the house and the crew busy filling the first 10 of the columns.pklongball (0 votes)
29 Jan. 2009The floor panels were delivered today. We have 3 different lengths to span the areas needed.pklongball (0 votes)