North & East viewNorth & East View of the house when we had to return home last year.bngldsmth (0 votes)
|
|
Front & North viewView of the front and north elevation of the house when we had to return home last year.bngldsmth (0 votes)
|
|
Front ViewFront view of the house when we had to return home last year.bngldsmth (0 votes)
|
|
Front & side viewAgain the front & side view of the house when we had to return home last year.bngldsmth (0 votes)
|
|
North & West house viewThis shows the view of the front (west elevation) and side (north) of the house when we had to return home last year.bngldsmth (0 votes)
|
|
kitchen side viewThis shows the kitchen & bathroom(south elevation) of the house when we had to return home last year.bngldsmth (0 votes)
|
|
Locking door knobsStandard Thai style locking doors knobs. These cost 250 baht from HomePro. There are cheaper ones, and I have seen cheaper ones installed in multi-million luxury homes in developments on Samui.jazzman (0 votes)
|
|
HingesSold in pack of four. Not the very cheapest but far from luxury, these cost 199 baht per pack at HomePro.
We install three per door.jazzman (0 votes)
|
|
DoorsQuite heavy and sturdy, these exterior doors are made of strong, hot pressed fibre-board to give the panel shapes. 550 baht each from HomePro. Cheap and easy to replace if they get kicked in - worth thinking about if you are building a motel or bungalows. The wooden frames (not shown) were bought at GlobalHouse, 590 baht each, made of Mai Deng.jazzman (0 votes)
|
|
Window winderWinder for louvre type windows. Nothing like the heavy duty quality die-cast used on our kitchen window. These cost 35 baht each from the local hardware store; better ones can cost 80 - 150 baht.jazzman (0 votes)
|
|
Day 7Most of the walls are built, except the font ones that will have the doors and windows. Still some steel to be put in the roof. The workers chop and change what they are doing, but I let them get on with it. I can watch everything from my office window only 20m away.jazzman (0 votes)
|
|
Day 8More progress on the walls. The 7 cm thick concrete floors have been laid in three of the rooms and the pits for the septic tanks have been dug. Wire mesh reinforcing was laid in the concrete.jazzman (0 votes)
|
|