happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Top rated - User galleries
P2181785.jpg
Box BeamsA little closer look at the welds that hold the beam section togetherpklongball00000
(0 votes)
P2181786.jpg
Box BeamsHere we have a completed section of the box beam.pklongball00000
(0 votes)
P2181789.jpg
Box Beams17 Feb 2009 They started the day measuring the "C" channel and cutting to length and welding pieces together to get the correct lengths and then sandwiched two pieces together to make a bx beam. Each length will span several columns to form the support for the rest of the roof structure.pklongball00000
(0 votes)
P2191791.jpg
The roof begins18 Feb 2009 second day of roof work. The first section of the steel box beam is raised into position and then welded. Many more to go but we have a good start.pklongball00000
(0 votes)
bathroom_floor.JPG
Bathroom floorThe bathroom floors will be concreted later. They are 5 cm lower than the room floors and have a 1:100 slope to the floor drain. The bathroom area looks small in the photo but it is really quite adequate at 1.4 x 2 m for a hotel room. I once rented an expensive condo in Bangkok with a smaller bathroom.jazzman00000
(0 votes)
chasing.JPG
ChasingThe electricians started today chasing the walls for the electrical conduits. Although this is a low budget build, we're still using relatively good quality fittings, and concealed wiring. I've tried many times to teach the men to cut the channels with an angle grinder and just knock out the the stuff in the middle, but to no avail. Still using a hammer and a bent nail. Back home in France I have a special two-bladed power tool attachment for doing this.1 commentsjazzman00000
(0 votes)
P2141776.jpg
Valentine's Day 2009This is almost noon on Saturday after the finish of the floor pour on Friday. The builder will have someone on site watering down the concrete to keep it drying a little slower pklongball00000
(0 votes)
P2141778.jpg
Valentine's Day 2009So we now have a poured floor and this brings an end to this phase of the build. Next week brings the beginning of the roof steel work and maybe morepklongball00000
(0 votes)
P2131775.jpg
Friday the 13thThe reflection off the fresh concrete.pklongball00000
(0 votes)
P2131773.jpg
Friday the 13thHard work to smooth out the fresh concretepklongball00000
(0 votes)
P2131771.jpg
Friday the 13thScree ding (spelling?) the fresh concretepklongball00000
(0 votes)
P2131769.jpg
Friday the 13thThe Bucket brigade passing the concrete to finish the balcony. This section took about 4 hours to finish.pklongball00000
(0 votes)