Top rated - User galleries |
19 March 2009This is a front view at about 4 in the afternoon. The roof tile crew did a nice days work.pklongball (0 votes)
|
|
19 March 2009So we had a good bit of work on the tile today. I would say about 3 days should get the majority of tile in place.pklongball (0 votes)
|
|
17 March 2009The wall work, roof tile work and electric pipe work all going on at the same time.pklongball (0 votes)
|
|
17 March 2009The view today March 17. happy St Patty's Daypklongball (0 votes)
|
|
16 March 2009Here we are looking from the master bedroom entry door into what will be the dressing area of the master bedroom.pklongball (0 votes)
|
|
16 March 2009The very early stage of the wall build. This view is from the master bedroom looking through what will be a window across the balcony to the kitchen door.pklongball (0 votes)
|
|
16 March 2009Soon this stack of tile will be on the roof.pklongball (0 votes)
|
|
17 March 2009Sparky and helper installing a pipe and boxpklongball (0 votes)
|
|
17 March 2009The wall building is interrupted to allow the electrician "Sparky" and helper to install the boxes and conduits for the plugs and switches inside the wall cavity. From now til the Sparky finishes this part they will work together. We can also see the roof crew is moving tiles to the roof area for installation.pklongball (0 votes)
|
|
16 March 2009The living room exterior wall where I hope to place the wide screen TVpklongball (0 votes)
|
|
16 March 2009Here we have the beginning of the long exterior kitchen wall. If all goes well this will have the cooktop, oven and micro along this length.pklongball (0 votes)
|
|
16 March 2009A wall begins. This wall happens to be the left wall of the storage room and the master bedroom doorway next to the column.pklongball (0 votes)
|
|
5254 files on 438 page(s) |
|
|
|
|
|