P4282059.JPG
28 AprilA look under the ceiling to see the metal gridwork for the "green" board that will be installed later.pklongball00000
(0 votes)
P4282048.JPG
28 AprilTwo of the ceiling crew hanging the metal gridwork for the back veranda ceiling.pklongball00000
(0 votes)
P4282049.JPG
28 AprilA look at some of the metal stringers and grid used to prepare for the gypsum ceiling around the eaves.pklongball00000
(0 votes)
P4282050.JPG
28 AprilHere we see and assortment of supply and drains. The open wall cavity allows them to put in both bathrooms at the same time. Only a minimal amount of pipes are buried in the floor tile.pklongball00000
(0 votes)
P4282051.JPG
28 AprilThese two water men are installing the cold supply lines. White shirt is the bossmanpklongball00000
(0 votes)
P4282052.JPG
28 AprilThe start of installing the drain lines in one bathroompklongball00000
(0 votes)
P4282043.JPG
28 AprilThe labor crew hand dug this trench around the property perimeter from the septic tank. A series of pipe and boxes will be installed to drain the run out from the septic tank as well as the grey water from the showers and sinks and any water from rain on the land. Ends in the street sewer drainage system.pklongball00000
(0 votes)
P4282044.JPG
28 AprilOne 1600 liter tank for the two toilets should do the trick.pklongball00000
(0 votes)
P4282045.JPG
28 AprilNo real explanation here as this is a partially complete drain from the toilets.pklongball00000
(0 votes)
P4282046.JPG
28 AprilAt the same time as the ceiling crew arrived the waterman finally made a return and started his part of the job. Here we can see the now installed toilet pipes and the beginning of the shower and sinks drain linespklongball00000
(0 votes)
P4282047.JPG
28 AprilWe have some work starting on the gypsum ceiling. The crew came in today and started outside.pklongball00000
(0 votes)
CIMG1683.jpg
Gypsum CeilingI don't know how they were able to keep out of each others way, but the gypsum ceiling guys and the tile guys were working at the same time. Here, the steel supports in the living room are going up. We used foil-backed gypsum, and it took about 3 working days to complete all the ceiling work.DrDave00000
(0 votes)