5 MayA view looking at the living room ceiling area and gridwork and some drywall.pklongball (0 votes)
5 MayThe septic tank is now half buried and the newly dug trench from the street comes to the drain box. I need to get them to be sure that no water from any drain line in the house can drain to the back of the land so some sort of blocking will have to be placed in the pipe thats heads and slopes to the back.pklongball (0 votes)
5 MayToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongball (0 votes)
5 MayAnother view from under the veranda ceilingpklongball (0 votes)
5 MayMore of the ceiling work around the back veranda areapklongball (0 votes)
5 MayMore of the ceiling work around the back veranda areapklongball (0 votes)
5 MayHere we have some of the completed work around the exterior soffits or eaves. Later we will add some ventilation ports.pklongball (0 votes)
5 MayView of the kitchen ceiling gridpklongball (0 votes)
5 MayHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball (0 votes)
5 MayMaster bedroom ceiling and some of the electric pipes and boxespklongball (0 votes)
5 MayAnother view of the newly pulled wire for the bedroom down lights and fanpklongball (0 votes)
5 MayNot sure if you can pick it up in this view but I am trying to show some electrical conduit and now wires for the ceiling drop lights and the fan. Sparky was here today before the ceiling gets closed up on him.pklongball (0 votes)