20 MayI wanted to show the stubbed up end of the third PE pipe that Sparky ran. This pipe will have the poweer for the wall lighting and automatic gate opener.pklongball (0 votes)
20 MayThis is one of the paint crew and he was painting the wood trim with a primerpklongball (0 votes)
20 MayToday we have a view of the back of the place and we have a new coat of white primer paint to seepklongball (0 votes)
19 MayAnother view of the two cable feeders. Before the needed length was pulled in , tile man 1 went under the house to help pull. So we ended up with 3 pulling and one feeding. But in about 20 minutes or so it was done.pklongball (0 votes)
19 maySparky started feeding in the NYY cable and his helper was under the house pulling it. After about 15 meters the cable stopped and his mate was almost spent trying to pull the cable alone. Sparky enlisted the help of the tile installers. In this view tile man 1 is helping to feed cable and tile man 2 went under the house to help pull.pklongball (0 votes)
19 MayHere we can see the NYY cable and the now attached pull rope.pklongball (0 votes)
19 MayThe two PE pipes that will have the main supply cable and the telephone cable pulled in. We will have two phone cables in the smaller one along with an extra pull wire for future cable TVpklongball (0 votes)
19 MayAnother view of the pull rope disappearing into the PE pipepklongball (0 votes)
19 MayIn this shot Sparky is guiding the pull rope into the PE pipe. They started with a pull wire/cable and attached a pulling rope and attached this to the NYY cable.pklongball (0 votes)
19 MayHere we have Sparky just starting to feed the 4 conductor NYY cable into the PE pipe. The 16mm2 cable is 65 meters long and very heavy.pklongball (0 votes)
18 MaySparky is feeding into the 2 inch pipe a piece of stiff wire that will be used as the pulling wire for the NYY cablepklongball (0 votes)
18 MayThis is the coil of wire used as the pulling wirepklongball (0 votes)