23 May 2009This old guy has worked for the builder for quite some time. He does most of the wood work. In this shot he's working on their table saw cutting some wood for the trim they are building for the front veranda.pklongball (0 votes)
23 May 2009The front door frame has been cleaned and sanded a bit and a coat of stain has been applied. All wood door frames got this treatment today.pklongball (0 votes)
20 MayThe ceiling "mud" man. The 2 bathrooms are the last to be finished.pklongball (0 votes)
20 MayMore of the finished ceiling just before paintingpklongball (0 votes)
20 MayThe now finished ceiling just before the primer and main paintingpklongball (0 votes)
20 MayTwo of the paint crew. These folks are sanding smooth the walls after an application of a skim coat to the rendered walls. This is the final sanding before painting.pklongball (0 votes)
20 MayBack of the house looking at the master bedroom door and the now painted walls. First coat is a primer coatpklongball (0 votes)
20 MayAnother angle of the tile in the bedroompklongball (0 votes)
20 MayNow we have floor tile in the master bedroom. This tile has a simulated woodgrain look.pklongball (0 votes)
21 MayAnother view of Sparky the pole jockey. I don't know if you can see the heavy rope he has used around his waist and around the pole as a safety. pklongball (0 votes)
21 MayThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball (0 votes)
20 MayHere we can see the finished PE pipe that has 2 phone cables. One will be active and the second a backup pair.pklongball (0 votes)