happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Top rated - User galleries
P5302315.JPG
30 MayA long view of the team preparing to lay the sidewalk concretepklongball00000
(0 votes)
P5302316.JPG
30 MayThe front step area that is being prepared for the concrete walk way.pklongball00000
(0 votes)
P5302317.JPG
30 MayWhile the tile crew is working inside the concrete crew is busy laying the sidewalk on the side of the house to the rear steps.pklongball00000
(0 votes)
P5302318.JPG
30 MayThe tile crew has now made a good start on laying the main floor tile.pklongball00000
(0 votes)
P5272289.JPG
27 MayA very long shot of the house as seen from the soi 3 properties awaypklongball00000
(0 votes)
P5272290.JPG
27 MayHere we have one of the paint team applying the mud and tape to the sheetrock installed yesterdaypklongball00000
(0 votes)
P5272295.JPG
27 MayMore of the same paint work.pklongball00000
(0 votes)
P5272294.JPG
27 MayThe rear veranda floor, walls, ceiling and trimpklongball00000
(0 votes)
P5272293.JPG
27 MayThe paint team adding some more colorpklongball00000
(0 votes)
P5272291.JPG
27 MayI'm adding the next photos in the Ceiling album as they are somewhat related. This wood work trim is now installed to the front and rear balcony ceiling area to add some effect to the look. After the wood was installed some sheetrock blocking was added to keep birds and critters from perching on the top inside and making a home there. There are several shots of this wood and sheetrockpklongball00000
(0 votes)
P5272284.JPG
27 MayA right side view with the new paint colors. The next 5 or 6 pics will show different angles of the new paint.pklongball00000
(0 votes)
P5272285.JPG
27 MayThe view of the front and all the painting cans and other construction debris but now we have color.pklongball00000
(0 votes)
5254 files on 438 page(s) 345

Debug Info 
Debug Output: show / hide