June 22From the veranda the view of the pump room and waitng for the tile and floorpklongball (0 votes)
|
|
June 22The cabinet man came out yesterday to cut the openings for the HOB and the sink. They enede up removing one interior partition as the sink is bigger than they planned. Or should I say did not plan. They had pictures and drawings of the exact sink we bought and the last 3 weeks we had the sink but they still built the base for the sink too small, plus its not centered on the window as I asked.pklongball (0 votes)
|
|
June 22Today's view of the cabinets waiting now for the wall painting and tiling.pklongball (0 votes)
|
|
June 22Inside of the walk in gate area showing the gray plastic conduits for the lightspklongball (0 votes)
|
|
June 22Front wall view. We decided to have the land developer build his "free" included wall rather than pay for one now as the budget is getting tight. We did add the walk-in gate and widen the drive in one meter.pklongball (0 votes)
|
|
June 22The view today. Roof steel on and painted, tile waiting to install and one wall completedpklongball (0 votes)
|
|
June 22Here we have the 2 pieces of granite for the cabinet tops in the kitchen. Tile man will be doinf the work.pklongball (0 votes)
|
|
June 22A quick view of the front and the wood rails that are installed now. One small section on the right side of the steps will complete the front.pklongball (0 votes)
|
|
June 15We have the post and rails now we need some spokespklongball (0 votes)
|
|
June 15The post and rails are in place now for the spokespklongball (0 votes)
|
|
June 15The tile crew is working outside today getting the walk ready to apply the sand wash. We decided on not using tile herepklongball (0 votes)
|
|
June 15Here we have the master bath vanity about 60%. pklongball (0 votes)
|
|