July 7Two down lights will light the sidewalk to the back steps.pklongball (0 votes)
July 7Another of the down lights at the top of the front stepspklongball (0 votes)
July 7Sparky has installed most of the lights now. Here we have the main room chandelierpklongball (0 votes)
July 1The finishing stages of placing the driveway curbingpklongball (0 votes)
July 6We had a pretty heavy rain overnight and this is the stading water from that storm. We will need to re-grade this area to drain a bit better. Tractor man promised us some available time yet.pklongball (0 votes)
July 6Double width pad area for the two compressorspklongball (0 votes)
July 6Compressor and electric wiring for the guest bedroom AC and the living room ACpklongball (0 votes)
July 6Outdoor location of the master bedroom AC compressor. This spot will be filled with concrete for the pad areapklongball (0 votes)
June 30The delivery of the curbing for the driveway. 105 each of the 50 cm long precast blockspklongball (0 votes)
June 30Now we have the kitchen lights installed and ready for powerpklongball (0 votes)
June 30Another of the switchespklongball (0 votes)
June 30One of the many switches used in our house. I have 3 different types. Single, 2-way and 3-way for different light control purposespklongball (0 votes)