happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Top rated - User galleries
installing_dpc_2.jpg
Damp Proofing preparationchangnoi00000
(0 votes)
installing_dpc___mesh_4.jpg
Installing Damp Proofing & Meshchangnoi00000
(0 votes)
GF_cast_4_with_wc_pit.jpg
View of whole groundfloor after concrete pourThis shows the groundfloor after the pour from the back to the front on the right where the wc will bechangnoi00000
(0 votes)
GF_cast_4_with_wc_pit___pipes.jpg
Ground floor WC after concrete pourchangnoi00000
(0 votes)
GF_filled_with_damp_proof_pegs_and_mesh.jpg
Ground floor with damp proof and mesh laidchangnoi00000
(0 votes)
gf_mum_bedroom_with_bathroom_pit.jpg
Mums bedroom and Ensuite after the concrete pourchangnoi00000
(0 votes)
GF_WC_with_pipes.jpg
Prep for downstairs WCThis shows the pipework installed prior to the concrete pourchangnoi00000
(0 votes)
beam_joint.jpg
Upper Ring Beam JointA stunning example of ring beam work.changnoi00000
(0 votes)
bending_db1.jpg
A quick shot of DB bending!!changnoi00000
(0 votes)
building_walls.jpg
After the Groundfloor has set we start the wallsNo hanging around here straight on with starting the walls this weekend.changnoi00000
(0 votes)
GF_balconey.jpg
Prep for Concrete PourThis view shows the prep going on prior to the pour of concrete and shows where the balconey will be on the side of the house. This area along with all bathrooms will be poured seperately as it will be lower than the ground floor with a slight slope for water drainage.changnoi00000
(0 votes)
GF_cast.jpg
Groundfloor CastThis was the day after the concrete pour and already hard so started building wallschangnoi00000
(0 votes)
5254 files on 438 page(s) 312

Debug Info 
Debug Output: show / hide