|
Top rated - User galleries |
Whole of upper ringbeams with formwork removed.changnoi (0 votes)
|
|
Ready for the Pour to startchangnoi (0 votes)
|
|
Starting Concrete Pour from the backUtility Room, Kitchen, hallway , balconey to rightchangnoi (0 votes)
|
|
Starting the Ground floor pour from the backMum bedroom, ensuite, hallway and GF balconey to rightchangnoi (0 votes)
|
|
Starting the Ground floor pour from the backMums bedroom and ensuite areachangnoi (0 votes)
|
|
Used Euka Poles in LH AlleyThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoi (0 votes)
|
|
Right Hand Alley full of Euka Poles from ScaffoldingThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoi (0 votes)
|
|
Mums Ensuite before Concrete Pourchangnoi (0 votes)
|
|
|
Ringbeams with framework removedchangnoi (0 votes)
|
|
Prep for GF WC with pipeschangnoi (0 votes)
|
|
Height Sticks for Concrete Pourchangnoi (0 votes)
|
|
5254 files on 438 page(s) |
|
|
|
|
|
311 | |
|
|
|
|
|
|
|