Jan.29,2010The water,sand, granite that was coming out of the bore. Almost finishedpklongball (0 votes)
|
|
|
Jan.28,2010One man ran the operation and the second man was the "rough neck" that did all the laor of adding drilling pipe and checking the leavings coming from the bore.pklongball (0 votes)
|
|
Jan.28,2010The work is boring and dirty and leaves a big mess in the yard.pklongball (0 votes)
|
|
Jan.29,2010Day two the crew was now drilling into the granite about 25 meters down.pklongball (0 votes)
|
|
Jan.29,2010This is the air compressor they used to run the drill head when drilling in to the rock/granite and to blow out the hole.pklongball (0 votes)
|
|
Jan.29,2010The second day of drilling with the air pressure was extremely noisy and dirty and we had water and muddy water everywhere.pklongball (0 votes)
|
|
Jan.27,2010The location for the borehole was marked so the first order of business was to open a section of the wall and drive the drilling rig into the yard.pklongball (0 votes)
|
|
Jan.27,2010The opening in the wall was just barely big enough for the rig.pklongball (0 votes)
|
|
Jan.27,2010Backed in to the exact spotpklongball (0 votes)
|
|
Jan.27,2010Once in place then the set up of the rig beginspklongball (0 votes)
|
|
Jan.28,2010The crew came back in the morning of day 2 to begin the drilling. It will take one day to drill down about 20 meters or so into the soft dirt, sand and gravel.pklongball (0 votes)
|
|