IMG_3558.JPG
Workers house side viewOur electricity pole in the foreground. Later when we dig holes for the fence, we will put some concrete around the pole, currently its only dug in.Max&Bee-in-CM00000
(0 votes)
IMG_3617.JPG
Workers house front viewThey workers built their bamboo house in a few hours, very efficientMax&Bee-in-CM00000
(0 votes)
IMG_3540.JPG
measuring the edgeshave to get the edge straightMax&Bee-in-CM00000
(0 votes)
IMG_3543.JPG
Laying out the house on the landthe yellow soil in contrast to the rice fieldMax&Bee-in-CM00000
(0 votes)
IMG_3287.JPG
staff ready to build their accomodationMax&Bee-in-CM00000
(0 votes)
IMG_3293.JPG
staff ready to build thei accomodationthe staff bring their house to setup on the landMax&Bee-in-CM00000
(0 votes)
IMG_3052.JPG
awesome sunsetgreat views from the landMax&Bee-in-CM00000
(0 votes)
IMG_3147.JPG
main switchour electricity man installed the master switch on our poleMax&Bee-in-CM00000
(0 votes)
IMG_3288.JPG
electricity company installed the single phase meterstill deciding whether to get 3 phase power, the quote was for 68,000 baht, or to go ahead with single phase.Max&Bee-in-CM00000
(0 votes)
IMG_2848.JPG
drill truckarrives on site ready to drillMax&Bee-in-CM00000
(0 votes)
IMG_2859.JPG
heavy escavatorthe soil man needed to bring in a "big macro" to take out some stubborn tree stumps.Max&Bee-in-CM00000
(0 votes)
IMG_2926.JPG
drilling the holethe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.
Max&Bee-in-CM00000
(0 votes)