Workers house front viewThey workers built their bamboo house in a few hours, very efficientMax&Bee-in-CM (0 votes)
|
|
measuring the edgeshave to get the edge straightMax&Bee-in-CM (0 votes)
|
|
Laying out the house on the landthe yellow soil in contrast to the rice fieldMax&Bee-in-CM (0 votes)
|
|
|
staff ready to build thei accomodationthe staff bring their house to setup on the landMax&Bee-in-CM (0 votes)
|
|
|
main switchour electricity man installed the master switch on our poleMax&Bee-in-CM (0 votes)
|
|
electricity company installed the single phase meterstill deciding whether to get 3 phase power, the quote was for 68,000 baht, or to go ahead with single phase.Max&Bee-in-CM (0 votes)
|
|
|
heavy escavatorthe soil man needed to bring in a "big macro" to take out some stubborn tree stumps.Max&Bee-in-CM (0 votes)
|
|
drilling the holethe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.Max&Bee-in-CM (0 votes)
|
|
|