happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Top rated - User galleries
IMG_5153.JPG
Front porchThe front porch was incorrectly placed about 20 cm below the level of the house floor, so they had to redo it today.Max&Bee-in-CM00000
(0 votes)
IMG_5160.JPG
Attaching the formworkLots of sticks are used to reinforce the formwork.Max&Bee-in-CM00000
(0 votes)
IMG_5101.JPG
Ground beams rebar doneAll the rebar for the ground beams has been completed. Next step is the form work for the concrete.Max&Bee-in-CM00000
(0 votes)
IMG_5071.JPG
Toilet, bathroom and bedroomLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM00000
(0 votes)
IMG_5079.JPG
The meals areaLooking at the meals area at the rear left of the house.Max&Bee-in-CM00000
(0 votes)
IMG_5086.JPG
A cross connectA cross connect for the rebar. I like how they bend the rebar to squeeze it inside the column.Max&Bee-in-CM00000
(0 votes)
IMG_5094.JPG
T connectionA T connection for the rebarMax&Bee-in-CM00000
(0 votes)
IMG_5098.JPG
View from the entrance corridorStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CM00000
(0 votes)
IMG_5035.JPG
Master bedroomAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM00000
(0 votes)
IMG_5039.JPG
Right angle rebarCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CM00000
(0 votes)
IMG_5040.JPG
Front right cornerLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM00000
(0 votes)
IMG_5067.JPG
Master bedroomThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM00000
(0 votes)
5254 files on 438 page(s) 272

Debug Info 
Debug Output: show / hide