Top rated - User galleries |
Plasterboard suspension.A lot opf people on site today, electricians installing the consumer units in the rooms and the fans, and the ceiling men working in all the rooms at the same time. We had also started touching up the welds and scratches on the steel with red oxide, but gave up and started digging footings for the perimeter wall instead.
The materials for the ceiling come to almost exactly 100 baht per square metre.
The complete invoice details have been posted on the forum.jazzman (1 votes)
|
|
Ceiling fansCheap, 48", only 590 baht in GlobalHouse. This one is just spot welded to the beam. It will be taken down again and the tube will be cut to the correct length for suspension in the circular ceiling recess.. The hook will then be securely bolted to the beam and the welds repainted.jazzman (1 votes)
|
|
Day 26 RoofThe roof is almost finished with just a few small snags to tidy up. Remember that there are no drawings for this project and it's a question of make-it-up-as-you-go. It's also a training excercise for my workers. We still have a lot to do on the land including a frontage wall with gate and motel gatehouse at one end, and another gate with archway at the other end of the land, a large sala as a dining-room restaurant, a floating sala on the pond, and a meeting room/classroom on the field behind.jazzman (1 votes)
|
|
|
Front door and living roomFront door and living room through to the two bedroom doorsbngldsmth (1 votes)
|
|
|
Back of the house. decorative columns etc. going on 14-09-08kornoipaddy (1 votes)
|
|
Floor drain for bathrooms, kitchens, patios, etc.These are made of high quality stainless steel, are an extremely effective design, easy to clean out and simply cute. They come in several sizes from square at 14 x 14 cm to rectangular at 14 x 32 cm. Disadvantage? The price! (like everything else from Cotto) - about 1,000 baht.
As Thai tilers usually cut tiles with their teeth (or so it seems), we found it better to avoid having them install circular drains.jazzman (1 votes)
|
|
Floor slabs being laid in place.Rick B (1 votes)
|
|
Forms for the first floor beams are being assembled.Rick B (1 votes)
|
|
|
slabs laid over the beams. 10cm of cement will be poured on top of this.somdet (1 votes)
|
|
5254 files on 438 page(s) |
|
|
|
|
|
24 | |
|
|
|
|
|
|
|